Cruze |
||||||||
|
|
|
|||||||
| • | Insert into the pistons with piston ring spanner and "TOP" pointing upwards. |
| • | Set the piston ring gap. |
| - | First piston ring (right-hand ring) in position (1) |
| - | Second piston ring (minute ring) in position (2) |
| - | Interim ring of oil scraper ring in position (3), steel band rings of oil scraper ring in position (4 and/or 5) |
Note: Note installation position of the piston in respect of the connection rod.
| • | Press the gudgeon pin into the piston and the connection rod by hand. |
| • | Insert the retainer in the annular groove on the piston. |
| • | Ensure the retainer is firmly seated in the groove. |
| © Copyright Chevrolet. All rights reserved |