Cruze |
||||||||
|
|
|
|||||||
| Table 1: | 2nd Gear Assemble |
| Table 2: | 1st and 2nd Gear Synchroniser Removal |
| Table 3: | 1st and 2nd Gear Synchroniser Installation |
| Table 4: | 1st Gear Bearing Sleeve Installation |
| Table 5: | 1st a Gear Synchroniser Assemble |
| Table 6: | 1st Gear Installation |
| Table 7: | 1st Gear Bearing Retaining Ring Installation |
Callout | Component Name |
|---|---|
1 | Counter Gear Bearing Tip |
2 | 2nd Gear Tip |
3 | 2nd Gear Inner Blocking Ring Tip |
4 | 2nd Gear Intermediate Blocking Ring Tip |
5 | 2nd Gear Outer Blocking Ring Tip |
Callout | Component Name |
|---|---|
1 | 1st and 2nd Gear Synchroniser |
Callout | Component Name | ||||||
|---|---|---|---|---|---|---|---|
Preliminary Procedure
Special ToolsDT-48235 Intermediate 1st and 2nd Synchroniser Installer | |||||||
1 | 1st and 2nd Gear Synchroniser Assembly Tip | ||||||
Callout | Component Name |
|---|---|
Special ToolsDT-48235 Intermediate 1st and 2nd Synchroniser Installer | |
1 | 1st Gear Bearing Roller Spacer |
2 | 1st Gear Bearing Sleeve Tip |
Callout | Component Name |
|---|---|
1 | 1st Gear Outer Blocking Ring |
2 | 1st Gear Intermediate Blocking Ring |
3 | 1st Gear Inner Blocking Ring |
Callout | Component Name |
|---|---|
1 | 1st Gear Bearing |
2 | 1st Gear Tip |
3 | 1st Gear Bearing |
Callout | Component Name |
|---|---|
Special ToolsDT-48235 Intermediate 1st and 2nd Synchroniser Installer | |
1 | 1st Gear Bearing Retaining Ring Tip |
| © Copyright Chevrolet. All rights reserved |